Review Performance
Evaluate temperature difference, wet-bulb conditions, and cooling tower efficiency.
Engineering Excel Workbook
Evaluate cooling tower operating performance and cooling-water quality. Review thermal efficiency, cycles of concentration, and scaling or corrosion indicators in one Excel workbook.

Evaluate temperature difference, wet-bulb conditions, and cooling tower efficiency.
Review concentration cycles, LSI, suspended solids, and microbiological indicators.
Compare operating data and identify parameters requiring further investigation.
Operating basis, evaluation, and documented outputs.
Workbook Experience
Review the actual workbook structure, calculation sequence, and outputs before downloading.


Actual workbook PDF, page 1: thermal efficiency, concentration cycles, and LSI evaluation.
Review the calculation outputs against their stated operating basis.
| Evaluation Item | Workbook Evaluation |
|---|---|
| Thermal performance | Temperature difference and cooling tower efficiency calculated |
| Concentration cycles | Conductivity and silica concentration ratios evaluated |
| Scaling / corrosion | LSI and related water-quality indicators reviewed |
| Water clarity | Turbidity and suspended solids compared |
| Microbiological condition | Selected biological and nitrogen indicators summarized |
Review the stated assumptions and operating basis when interpreting these results.
Macro-enabled source
Site and water data
Efficiency and temperatures
Conductivity and silica
Scaling and operating indicators
Two-page workbook view
AIDIA supports preliminary engineering evaluation. Interpret results using project-specific operating data and professional engineering judgement. The Excel source is macro-enabled (.xlsm).
Bring operating temperatures and water-quality indicators into one structured evaluation workbook.