Packed Gas Stripping Tower Design Calculation

Design a countercurrent packed gas stripping tower for ammonia or VOC removal using a structured Excel workbook. Evaluate stripping factor, required air flow, tower diameter, packing depth, packed-bed hydraulic criteria, HTU–NTU sizing, and preliminary design compliance in one place.

Excel WorkbookLinked Design DashboardEngineering Review
AIDIA Packed Gas Stripping Tower Design Calculation promotional image featuring a packed tower and Excel workbook

What This Module Helps You Design

Preliminary Tower Sizing

Determine packed tower diameter, installed packing depth, total tower height, and the number of operating towers from the design wastewater flow and target removal.

Gas–Liquid Stripping Evaluation

Estimate stripping factor, air-to-liquid ratio, required airflow, HTU, NTU, and expected removal efficiency using the adopted design basis.

Engineering Review

Review liquid loading, gas velocity, packed-bed pressure drop, EBCT, and preliminary design checks in one traceable workbook.

Calculation Coverage

A linked calculation sequence from influent data and stripping assumptions through packed-tower sizing, hydraulic checks, and preliminary design review.

Wastewater feed Liquid distribution Blower air Off-gas outlet Treated effluent Packed gas stripping tower
Conceptual countercurrent gas stripping flow · not to scale

Design Basis & Air Requirement

  • Application selection: ammonia or VOC
  • Wastewater flow, influent and target concentration
  • Henry’s law constant, total pressure, and air properties
  • Minimum and design air-to-liquid ratio

Packed-Tower Hydraulic Sizing

  • Packing selection and packing factor
  • Gas and liquid loading evaluation
  • Cross-sectional area and adopted tower diameter
  • Packed-section pressure drop and hydraulic criteria

Mass Transfer & Preliminary Review

  • Stripping factor, HTU, and NTU sizing
  • Installed packing depth and total tower height
  • EBCT and blower requirement review
  • Removal-efficiency and preliminary design checks

Workbook Experience

See the Complete Engineering Workflow

Review actual calculation inputs and the linked Dashboard before purchasing the workbook.

AIDIA · Packed Gas Stripping TowerWorkbook excerpts
Actual packed gas stripping tower Excel dashboard excerpt

Actual packed gas stripping tower dashboard excerpt. The displayed figures are illustrative workbook results and remain subject to project-specific design verification.

Built-in Design Checks

Screen the preliminary packed-tower design against the adopted hydraulic, mass-transfer, and equipment criteria.

Packed gas stripping tower preliminary design evaluation coverage
Review ItemWorkbook Evaluation
Air-to-liquid ratioCheck the adopted design air requirement against the stripping basis
Gas velocity & flooding marginEvaluate operating gas loading against the packed-bed hydraulic limit
Pressure dropReview packed-section pressure drop from the generalized packed-column correlation
Packing depthVerify installed packing depth from the HTU–NTU method
EBCT & blower capacityReview contact time and blower requirement for preliminary operation

These checks support preliminary process evaluation only. Final packing selection, mist elimination, liquid distribution hardware, blower specification, off-gas handling, corrosion resistance, and field performance must be reviewed separately.

What's Included

  • READ ME

    Purpose & instructions

  • Cover

    Project information

  • Calculation

    Stripping basis, hydraulics & sizing

  • Dashboard

    Conceptual GA & design summary

  • Abbreviations

    Symbols & units

  • Reference Data

    Packing data & design criteria

AIDIA supports preliminary engineering calculation and review. Final project decisions remain subject to project-specific criteria, professional engineering judgement, and vendor confirmation.