Preliminary Tower Sizing
Determine packed tower diameter, installed packing depth, total tower height, and the number of operating towers from the design wastewater flow and target removal.
Engineering Excel Workbook
Design a countercurrent packed gas stripping tower for ammonia or VOC removal using a structured Excel workbook. Evaluate stripping factor, required air flow, tower diameter, packing depth, packed-bed hydraulic criteria, HTU–NTU sizing, and preliminary design compliance in one place.

Determine packed tower diameter, installed packing depth, total tower height, and the number of operating towers from the design wastewater flow and target removal.
Estimate stripping factor, air-to-liquid ratio, required airflow, HTU, NTU, and expected removal efficiency using the adopted design basis.
Review liquid loading, gas velocity, packed-bed pressure drop, EBCT, and preliminary design checks in one traceable workbook.
A linked calculation sequence from influent data and stripping assumptions through packed-tower sizing, hydraulic checks, and preliminary design review.
Workbook Experience
Review actual calculation inputs and the linked Dashboard before purchasing the workbook.


Actual packed gas stripping tower dashboard excerpt. The displayed figures are illustrative workbook results and remain subject to project-specific design verification.
Screen the preliminary packed-tower design against the adopted hydraulic, mass-transfer, and equipment criteria.
| Review Item | Workbook Evaluation |
|---|---|
| Air-to-liquid ratio | Check the adopted design air requirement against the stripping basis |
| Gas velocity & flooding margin | Evaluate operating gas loading against the packed-bed hydraulic limit |
| Pressure drop | Review packed-section pressure drop from the generalized packed-column correlation |
| Packing depth | Verify installed packing depth from the HTU–NTU method |
| EBCT & blower capacity | Review contact time and blower requirement for preliminary operation |
These checks support preliminary process evaluation only. Final packing selection, mist elimination, liquid distribution hardware, blower specification, off-gas handling, corrosion resistance, and field performance must be reviewed separately.
Purpose & instructions
Project information
Stripping basis, hydraulics & sizing
Conceptual GA & design summary
Symbols & units
Packing data & design criteria
AIDIA supports preliminary engineering calculation and review. Final project decisions remain subject to project-specific criteria, professional engineering judgement, and vendor confirmation.
Move from wastewater stripping targets and air-loading assumptions to a structured packed-tower sizing and design-review workbook.