Proper Sizing
Determine operating channels, lamp banks, modules, and installed lamp quantities.
Engineering Excel Workbook
Develop a preliminary wastewater UV channel and lamp configuration. Use selected reactor-specific performance inputs to review delivered dose, channel hydraulics, and installed equipment quantities.

Determine operating channels, lamp banks, modules, and installed lamp quantities.
Evaluate delivered UV dose, velocity, flow area, and channel headloss.
Document reactor-specific assumptions and identify items requiring manufacturer validation.
From design basis to configuration and engineering review.
Workbook Experience
Review the actual workbook structure, calculation sequence, design checks, and final outputs before purchase.



Actual UV Disinfection System Dashboard excerpt. Example information illustrates the workbook layout and design basis.
Review the selected configuration against the adopted design basis.
| Design Check | Workbook Evaluation |
|---|---|
| UV basis | Transmittance and selected reactor inputs reviewed |
| Channel loading | Design flow distributed across operating channels |
| Delivered dose | Estimated dose compared with the adopted target |
| Hydraulic performance | Velocity, flow area, headloss, and spacing evaluated |
| System configuration | Installed quantities and design status summarized |
Criteria and internal calculation logic remain inside the complete workbook.
Purpose & instructions
Project information
UV and hydraulic workflow
Key outputs
Performance inputs
Symbols & units
AIDIA supports preliminary engineering calculation and review. Final project decisions remain subject to project-specific criteria, professional engineering judgement, and vendor confirmation.
Move from preliminary sizing and screening to a structured, review-ready engineering workbook.